自拍区偷拍亚洲视频

Company News

CNOOC News

Media Reports

Multimedia center

Company News

Floating Installation of CEPI Module of Caofeidian 11-1 and 11-6 Oilfields Comprehensive Adjustment Project was Completed

Date:2019-09-05

自拍区偷拍亚洲视频On August 30, “Offshore Oil 228” finished the floating installation of CEPI module for Caofeidian 11-1 and 11-6 Oilfields Comprehensive Adjustment Project, refreshing the record of floating installation time of CNOOC.

The module, which is about 12,000 t and an eight-leg three-layer main deck steel structure, was loaded out onshore on August 19. The floating was faced with multiple difficulties such as working face crossing double wellheads, covering the Christmas tree and low designed platform elevation, all of which lead to great installation difficulty. This floating operation achieved the first successful case of two times of wellhead area crossing in just one floating installation in China, powerfully guaranteeing the quick commissioning and operation of the platform.

Photo: Floating Completed


国产综合自拍|偷拍|偷拍自拍国产区第1页-久草在线免费视频在线观看